Reclamation announces 30-day public comment period for Central Valley Project Friant Water Authority operation, maintenance and replacement contract

Webp adobestock 324498179
Adobe Stock

Reclamation announces 30-day public comment period for Central Valley Project Friant Water Authority operation, maintenance and replacement contract

The following news_release was published by the Bureau of Reclamation on Aug. 12, 2020. It is reproduced in full below.

Fresno, Calif. - The Bureau of Reclamation announced today a 30-day public comment period for a 35-year contract renewal of the transfer of operation, maintenance and replacement activities related to Friant-Kern Canal and other associated works to the Friant Water Authority.

The Friant Water Authority is the non-federal operating entity for the Friant-Kern Canal.

The canal runs 152 miles from the town of Friant to just north of Bakersfield and provides water to over one million acres of highly productive farmland.

The contract is available at: https://www.usbr.gov/mp/sccao/water-contracting.html.

Comments must be received by close of business, Sept. 11, 2020, and sent to Travis Buttelman, Region 10 Office, Bureau of Reclamation, 2800 Cottage Way, Sacramento, California 95825 or faxed to 916-978-5242 or emailed to jbuttelman@usbr.gov.

Contact Buttelman for more information at 916-978-5247 (TTY 800-877-8339).

Source: Bureau of Reclamation

ORGANIZATIONS IN THIS STORY

More News